How does the Point State Park fountain work?

How does the Point State Park fountain work?

At full pressure, the fountain pumps 17,000 gallons of chlorinated water per minute from an aquifer under the rivers. Before it’s turned on, the fountain is scrubbed by DCNR crew members and repaired for any damages from wintry weather.

How deep is the water at the point in Pittsburgh?

The river stage in Pittsburgh is on average between 16 and 17 feet, according to McCoy, and that level stays consistent from the Point, to several miles on both the Allegheny and Monongahela rivers, and down the Ohio to the Emsworth Locks and Dams at Neville Island.

How many acres is Point State Park?

36
The 36-acre park is located at 601 Commonwealth Place.

Is Point State Park free?

Point State Park is free and open to the public, as is the Fort Pitt Blockhouse located within the park.

How tall is the fountain in Point State Park?

The fountain in Point State Park, which sprays water up to 150 feet (46 m) in the air at the head of the Ohio River. The location of the fountain at the tip of the Point previously served as a connector for two old bridges, the Manchester Bridge (over the Allegheny River) and Point Bridge (over the Monongahela).

How often is point state park open to the public?

The park is open every day of the year, sunrise to sunset. Day use areas close at dusk. The park office is open specific hours. Contact the park office for facility seasons and hours.

Which is the oldest building in Point State Park?

A small brick building called the Blockhouse —actually an outbuilding known as a redoubt —remains in Point State Park, the only intact remnant of Fort Pitt. It was erected in 1764, and is believed to be the oldest building, not only in Pittsburgh, but in Western Pennsylvania.

When was the point State Park in Pittsburgh built?

Point State Park. Built on land acquired via eminent domain from industrial enterprises in the 1950s, the park opened in August 1974 when construction was completed on its iconic fountain. Pittsburgh settled on the current design after rejecting an alternative plan for a Point Park Civic Center designed by Frank Lloyd Wright .